Skip to main content

This page provides emergency management guidance, resources and links to support permit holders prepare for, report and respond to emergencies affecting energy resource operations.

Emergency Response and Safety

Name Date Published
BCER Roles & Responsibilities During an Incident
The BCER Roles & Responsibilities outlines the roles and responsibilities of the Regulator during an incident or emergency, and should be included in permit holders ERP.
Effective Date: Oct 28, 2025
Oct 28, 2025
Core ERP Content Checklist
Effective Date: Nov 28, 2023
Nov 28, 2023
Core ERP Content Checklist Guidance
Effective Date: Nov 28, 2023
Nov 28, 2023
Drilling & Initial Completions ERP Supplement Content Checklist
Effective Date: Dec 6, 2023
Dec 6, 2023
Drilling & Initial Completions ERP Supplement Content Checklist Guidance (v2.2)
Effective Date: Dec 6, 2023
Dec 6, 2023
Emergency Incident Notification Form
For informational purposes only. This form is used by the Emergency Officer for emergencies which meet BCER Level 1, 2, or 3 Classification. Emergency level incidents must be reported to the Regulator within 1 hour of the incident.
Nov 20, 2025
Emergency Management Manual (v3.0)
The Emergency Management Manual provides guidance to industry about emergency planning, response, and Emergency Response Plan (ERP) requirements for Corporate and Production ERPs.
Effective Date: Apr 10, 2025 - Please refer to the Table of Revisions within the document.
Apr 4, 2025
Emergency Management Regulation FAQ
Apr 9, 2018
Field / Facility / Downstream Pipeline ERP Supplement Content Checklist Guidance (v2.2)
Effective Date: Dec 6, 2023
Dec 6, 2023
Field Facility Pipeline ERP Supplement Content Checklist
Effective Date: Dec 14, 2023
Dec 14, 2023
Form M1 - Notification of a Full-Scale Exercise for a Facility/Pipeline Start-Up/Modification
A full-scale exercise is required prior to start-up for any of the following: A processing facility, an LNG facility, a petroleum or natural gas pipeline that is not part of a gathering system or fuel gas system, or any other facility, pipeline or equipment that is specified in EMR 4.1(3). The notification must be sent to emp@bc-er.ca. Minimum 30 days' notice is required.
Effective Date: Feb 16, 2024
Feb 16, 2024
Form M2 - Notification of ERP Review Meeting
The drilling crew and company representatives on a drilling site must be familiarized with the Drilling and Completions ERP. An ERP Review Meeting is required before surface casing is set for the first well on any multi-well pad. If the rig crew for subsequent wells on a specific pad site is different, or if a new drilling and completions ERP has been submitted for a well or well pad site, a subsequent meeting is required. The notification must be sent by email to emp@bc-er.ca. Minimum 2 business days' notice is required.
Effective Date: Jun 12, 2024
Jun 12, 2024
Form M3 - Notification of Emergency Management Exercise
The Form M3 is used by permit holders to notify the Regulator of annual emergency management exercises. The notification must be sent by email to emp@bc-er.ca. Minimum 30 days' notice is required.
Effective Date: Feb 16, 2024
Feb 16, 2024
Functional / Full Scale Exercise Evaluation Form
This document contains the criteria the Regulator uses to audit permit holder exercises. This information is being provided to ensure permit holders are aware of what they will be audited on and also so they can use the information to evaluate their own performance.
Effective Date: Nov 28, 2023
Nov 28, 2023
Incident Classification Matrix
Effective Date: Oct 31, 2025
Oct 31, 2025
Minor Incident Notification Form
This form is to be used for incidents which do not meet BCER Level 1, 2, or 3 Classification. Minor incidents must be reported to the BCER within 24 hours through the Regulator’s Incident Reporting System in CM-IS.
Nov 20, 2025
Tabletop Exercise Evaluation Form
This document contains the criteria the Regulator uses to audit permit holder exercises. This information is being provided to ensure permit holders are aware of what they will be audited on and also so they can use the information to evaluate their own performance.
Effective Date: Dec 6, 2023
Dec 6, 2023

The BCER's Incident Command System Response Guides below are intended to support permit holders effectively manage incidents by outlining key emergency response roles, response coordination tools and exercise planning.

Wildfire Updates and Resources

Permit holders should monitor provincial wildfire information and mapping to determine whether their assets may be affected. Wildfire information can change quickly and should be used together with direct operational awareness and emergency response procedures.

If assets are affected, contact the BCER’s Emergency Management team at emp@bc-er.ca for more information. If staff at a facility become aware of a new fire nearby, report it directly to BC Wildfire Service at 1-800-663-5555.

Flood Updates and River Forecast Resources

Permit holders should monitor flood and river forecast information when high water, flooding or related hazards may affect access, operations or facility status.

Reporting Facility Status During an Emergency

Permit holders must report the status of affected locations to the Ministry of Emergency Management and Climate Readiness (EMCR) when a natural disaster or emergency threatens a facility and requires evacuation, shut-in or other operational changes.

To report facility status, contact EMCR’s 24-hour reporting line at 1-800-663-3456.

Permit holders should provide the facility name, identification, location and current status, including whether the facility has been shut in. Reports should also identify any hazardous products and the amounts remaining on site to support first responder safety.

Provincial Emergency Updates

Visit BC Government news releases for the latest provincial updates related to emergencies, public safety and response coordination.