Approval documents available include both orders and explanatory cover letters for: waterflood (pressure maintenance), gas injection, innovative technology (experimental), Good Engineering Practice, disposal wells, observation wells, Concurrent Production, commingled production, and gascap blowdown.
These records span from 1964 to present-date and include any amendments made to an approval, as well as denial letters. Applications for these approvals may be requested by submission of a well data request form. The company name is that at the time of correspondence, and may not reflect the current well permit holder. The filter function allows partial entry of a single data field as search criteria.
Date Issued:
CONCURRENT SUNCOR Lagarde Dunlevy 'B' Modification Dec-27-90 (pdf)
| Reservoir Project Type | Concurrent Production |
| Applicant | Suncor Energy |
| Reservoir Field | Lagarde |
| Reservoir Formation | Dunlevy B |
Date Issued:
SWD BRR Beaver River Mattson WA 2313 Nov-29-90 (pdf)
| Reservoir Project Type | Produced Water Disposal |
| Applicant | Beaver River Resources Ltd |
| Reservoir Field | Beaver River |
| Reservoir Formation | Mattson |
| WA Number | 02313 |
Date Issued:
CONCURRENT-GEP UNOCAL Beatton RIver- Halfway 'F' Oct-31-90 (pdf)
| Reservoir Project Type | Concurrent Production |
| Applicant | Unocal Canada Management Limited |
| Reservoir Field | Beatton River |
| Reservoir Formation | Halfway F |
Date Issued:
PM SUNCOR Blueberry Debolt B Sept-21-90 (pdf)
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Suncor Energy |
| Reservoir Field | Blueberry |
| Reservoir Formation | Debolt |
Date Issued:
WATERINJ SCURRY RAINBOW West Eagle Sept-18-90 (pdf)
| Reservoir Project Type | Injectivity Testing |
| Applicant | Scurry Rainbow Oil Limited |
| Reservoir Field | Eagle West |
| Reservoir Formation | Belloy |
Date Issued:
CONCURRENT-GEP UNOCAL Elm Halfway 'C' Sept-12-90 (pdf)
| Reservoir Project Type | Concurrent Production |
| Applicant | Unocal Canada Limited |
| Reservoir Field | Elm |
| Reservoir Formation | Halfway 'C' |
Date Issued:
SWD IMPERIAL METALS Birch- Baldonnel C WA 6281 Aug-15-90 (pdf)
| Reservoir Project Type | Produced Water Disposal |
| Applicant | Imperial Oil Resources Ltd. |
| Reservoir Field | Birch |
| Reservoir Formation | Baldonnel C |
| WA Number | 06281 |
Date Issued:
GEP PHILLIPS Stoddart West Belloy 'C' Jul-04-90 (pdf)
| Reservoir Project Type | Good Engineering Practice |
| Applicant | Phillips Petroleum Resources Ltd |
| Reservoir Field | Stoddart West |
| Reservoir Formation | Belloy C |
Date Issued:
PM Petro-Canada Resources Peejay Unit#3 Jun-20-90 (pdf)
| Reservoir Project Type | Pressure Maintenance Waterflood |
| Applicant | Petro-Canada Resources |
| Reservoir Field | Peejay |
| Reservoir Formation | Halfway |
Date Issued:
SWD BRR Beaver River Mattson WA 2547 Jun-07-90 (pdf)
| Reservoir Project Type | Produced Water Disposal |
| Applicant | Beaver River Resources Ltd |
| Reservoir Field | Beaver River |
| Reservoir Formation | Mattson |
| WA Number | 02547 |
Date Issued:
GEP PHILLIPS Stoddart West Belloy 'C' Apr-10-90 (pdf)
| Reservoir Project Type | Good Engineering Practice |
| Applicant | Phillips Petroleum Resources Ltd |
| Reservoir Field | Stoddart West |
| Reservoir Formation | Belloy C |
Date Issued:
PM CANHUNTER Brassey Artex 'B', 'D' Amend Apr-06-90 (pdf)
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canhunter |
| Reservoir Field | Brassey |
| Reservoir Formation | Artex B D |
Date Issued:
SWD ESSO Blueberry W Debolt Apr-06-90 (pdf)
| Reservoir Project Type | Produced Water Disposal |
| Applicant | Esso Resources Canada |
| Reservoir Field | Blueberry West |
| Reservoir Formation | Debolt |
Date Issued:
CONCURRENT UNOCAL Weasel Halfway 'K' 'M' Apr-05-90 (pdf)
| Reservoir Project Type | Concurrent Production |
| Applicant | Unocal Canada Management Limited |
| Reservoir Field | Weasel |
| Reservoir Formation | Halfway K M |
Date Issued:
COM MURPHY Yoyo Slave Point Pine Point WA 7209 Mar-26-90 (pdf)
| Reservoir Project Type | Commingled Production |
| Applicant | Murphy Oil |
| Reservoir Field | Yoyo |
| Reservoir Formation | Slave Point |
| WA Number | 07209 |
Date Issued:
GEP BP Sukunka Baldonnel 'E' WA 4431 Rescind Mar-26-90 (pdf)
| Reservoir Project Type | Good Engineering Practice |
| Applicant | BP Canada Energy Company |
| Reservoir Field | Sukunka |
| Reservoir Formation | Baldonnel E |
| WA Number | 04431 |
Date Issued:
PM SCURRY RAINBOW Eagle Amend Mar-26-90 (pdf)
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Scurry Rainbow Oil Limited |
| Reservoir Field | Eagle |
| Reservoir Formation | Belloy A |
Date Issued:
CONCURRENT OGY PETROLEUMS Flatrock West Halfway 'D' Mar-20-90 (pdf)
| Reservoir Project Type | Concurrent Production |
| Applicant | OGY Petroleums |
| Reservoir Field | Flatrock West |
| Reservoir Formation | Halfway 'D' |
Date Issued:
CONCURRENT SUNCOR Lagarde Dunlevy 'B' Mar-20-90 (pdf)
| Reservoir Project Type | Concurrent Production |
| Applicant | Suncor Energy |
| Reservoir Field | Lagarde |
| Reservoir Formation | Dunlevy B |
Date Issued:
CONCURRENT GEP POCO Buick Creek Doig 'B' Feb-07-90 (pdf)
| Reservoir Project Type | Concurrent Production |
| Applicant | Poco Petroleum |
| Reservoir Field | Buick Creek |
| Reservoir Formation | Doig 'B' |
Date Issued:
GEP CANHUNTER Noel Cadotte Falher Amend Feb-02-90 (pdf)
| Reservoir Project Type | Good Engineering Practice |
| Applicant | Canhunter |
| Reservoir Field | Noel |
| Reservoir Formation | Cadotte Falher |