Approval documents available include both orders and explanatory cover letters for: waterflood (pressure maintenance), gas injection, innovative technology (experimental), Good Engineering Practice, disposal wells, observation wells, Concurrent Production, commingled production, and gascap blowdown.
These records span from 1964 to present-date and include any amendments made to an approval, as well as denial letters. Applications for these approvals may be requested by submission of a well data request form. The company name is that at the time of correspondence, and may not reflect the current well permit holder. The filter function allows partial entry of a single data field as search criteria.
PM CONA Squirrel North Pine C Encal Project Mar-20-20 (pdf)
| Date Issued |
March 20, 2020 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Cona Resources Ltd. |
| Reservoir Field | Squirrel |
| Reservoir Formation | North Pine C |
PM CONA Rigel Cecil B Amend 4 Feb-24-20 (pdf)
| Date Issued |
February 24, 2020 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Cona Resources Ltd. |
| Reservoir Field | Rigel |
| Reservoir Formation | Cecil B |
PM CNRL Stoddart West Belloy C Amend 7 Feb-10-20 (pdf)
| Date Issued |
February 10, 2020 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Stoddart West |
| Reservoir Formation | Belloy C |
PM CNRL Rigel Halfway 'C' Nov-16-95 (pdf)
| Date Issued |
November 16, 1995 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Rigel |
| Reservoir Formation | Halfway 'C' |
PM CNRL Rigel Halfway 'C' Nov-14-95 (pdf)
| Date Issued |
November 14, 1995 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Rigel |
| Reservoir Formation | Halfway 'C' |
PM CNRL Rigel Halfway 'C' Amend 1 Feb-17-97 (pdf)
| Date Issued |
February 17, 1997 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Rigel |
| Reservoir Formation | Halfway 'C' |
PM CNRL Rigel Cecil 'D' Apr-18-96 (pdf)
| Date Issued |
April 18, 1996 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Rigel |
| Reservoir Formation | Cecil D |
PM CNRL Peejay West Halfway 'A' Jan-21-97 (pdf)
| Date Issued |
January 21, 1997 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Peejay West |
| Reservoir Formation | Halfway 'A' |
PM CNRL Peejay West Halfway 'C' Oct-12-04 (pdf)
| Date Issued |
October 12, 2004 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Peejay West |
| Reservoir Formation | Halfway 'C' |
PM CNRL Peejay West Halfway 'C' Amend 2 Jan-13-14 (pdf)
| Date Issued |
January 13, 2014 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | CNRL |
| Reservoir Field | Peejay |
| Reservoir Formation | Halfway 'C' |
PM CNRL Peejay West Halfway 'A' Amend 3 Mar-02-11 (pdf)
| Date Issued |
March 2, 2011 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Peejay West |
| Reservoir Formation | Halfway 'A' |
PM CNRL Peejay West Halfway 'A' Amend 2 Mar-23-09 (pdf)
| Date Issued |
March 23, 2009 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Peejay West |
| Reservoir Formation | Halfway 'A' |
PM CNRL Peejay West Halfway 'A' Amend 1 Feb-22-99 (pdf)
| Date Issued |
February 22, 1999 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Peejay West |
| Reservoir Formation | Halfway 'A' |
PM CNRL Peejay West Halfway A Amend 5 Dec-19-19 (pdf)
| Date Issued |
December 19, 2019 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Peejay West |
| Reservoir Formation | Halfway A |
PM CNRL Peejay Unit 2 Halfway Amend Mar-13-00 (pdf)
| Date Issued |
March 13, 2000 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Peejay |
| Reservoir Formation | Halfway |
PM CNRL Peejay Halfway Units 2, 3 Amend 6, 7 Feb-13-03 (pdf)
| Date Issued |
February 13, 2003 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Peejay |
| Reservoir Formation | Halfway |
PM CNRL Peejay Halfway Unit 2 Amend 8 Jan-16-20 (pdf)
| Date Issued |
January 16, 2020 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Peejay |
| Reservoir Formation | Halfway |
PM CNRL Peejay Halfway Unit 2 Amend 7 Jan-18-10 (pdf)
| Date Issued |
January 18, 2010 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Peejay |
| Reservoir Formation | Halfway |
PM CNRL Peejay Halfway Unit 1 Nov-15-19 (pdf)
| Date Issued |
November 15, 2019 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Peejay |
| Reservoir Formation | Halfway |
PM CNRL Peejay Halfway CNRL Project Mar-16-20 (pdf)
| Date Issued |
March 16, 2020 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Peejay |
| Reservoir Formation | Halfway |
PM CNRL Peejay Halfway Amend 8 Nov-15-19 (pdf)
| Date Issued |
November 15, 2019 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. |
| Reservoir Field | Peejay |
| Reservoir Formation | Halfway |
PM CNRL Muskrat Boundary Lake A Amend 4 Apr-18-18 (pdf)
| Date Issued |
April 18, 2018 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Muskrat |
| Reservoir Formation | Boundary Lake A |
PM CNRL Muskrat Boundary Lake A Amend 3 Jan-4-18 (pdf)
| Date Issued |
January 4, 2018 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Muskrat |
| Reservoir Formation | Boundary Lake A |
PM CNRL Milligan Creek Halfway 'A' Unit 2 WA 1493 Amend Jan-10-00 (pdf)
| Date Issued |
January 10, 2000 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Milligan Creek |
| Reservoir Formation | Halfway 'A' |
| WA Number | 01493 |
PM CNRL Milligan Creek Halfway Unit 1 Pilot Feb-14-92 (pdf)
| Date Issued |
February 14, 1992 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Milligan Creek |
| Reservoir Formation | Halfway |
PM CNRL Milligan Creek Halfway A Unit 2 Feb-11-20 (pdf)
| Date Issued |
February 11, 2020 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Milligan Creek |
| Reservoir Formation | Halfway A |
PM CNRL Milligan Cr Halfway 'A' Unit 2 Amend 3 WA 2721 Mar-23-09 (pdf)
| Date Issued |
March 23, 2009 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Milligan Creek |
| Reservoir Formation | Halfway 'A' |
| WA Number | 02721 |
PM CNRL Lapp Halfway D CNRL Project Mar-20-20 (pdf)
| Date Issued |
March 20, 2020 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Lapp |
| Reservoir Formation | Halfway D |
PM CNRL Lapp Halfway 'D' Amend 3 Dec-05-14 (pdf)
| Date Issued |
December 22, 2014 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Lapp |
| Reservoir Formation | Halfway 'D' |
PM CNRL Inga Inga Unit 1 WA 3224 Oct-07-05 (pdf)
| Date Issued |
October 7, 2005 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Inga |
| Reservoir Formation | Inga |
| WA Number | 03224 |
PM CNRL Inga, Inga 'A' Unit 1 Amend 6 WA 1982 Jul-02-09 (pdf)
| Date Issued |
July 2, 2009 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Inga |
| Reservoir Formation | Inga A |
| WA Number | 01982 |
PM CNRL Inga Inga A Unit 5 Jan-30-20 (pdf)
| Date Issued |
January 30, 2020 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Inga |
| Reservoir Formation | Inga A |
PM CNRL Inga Inga A Unit 4 Jan-22-20 (pdf)
| Date Issued |
January 22, 2020 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Inga |
| Reservoir Formation | Inga A |
PM CNRL Inga Inga A Unit 2 Jan-20-20 (pdf)
| Date Issued |
January 20, 2020 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Inga |
| Reservoir Formation | Inga A |
PM CNRL Inga Inga A Amend 7 Oct-31-19 (pdf)
| Date Issued |
October 31, 2019 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. |
| Reservoir Field | Inga |
| Reservoir Formation | Inga A |
PM CNRL Halfway Debolt A Berkley Project Mar-16-20 (pdf)
| Date Issued |
March 16, 2020 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Halfway |
| Reservoir Formation | Debolt A |
PM CNRL Halfway Debolt A Berkley Project Feb-14-20 (pdf)
| Date Issued |
February 14, 2020 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Halfway |
| Reservoir Formation | Debolt A |
PM CNRL Eagle West Belloy A Amend 8 Jun-4-18 (pdf)
| Date Issued |
June 4, 2018 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Eagle West |
| Reservoir Formation | Belloy A |
PM CNRL Eagle West Belloy A Amend 7 Jul-31-17 (pdf)
| Date Issued |
July 31, 2017 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Eagle West |
| Reservoir Formation | Belloy A |
PM CNRL Crush Halfway B Unit 1 Dec-19-19 (pdf)
| Date Issued |
December 19, 2019 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. |
| Reservoir Field | Crush |
| Reservoir Formation | Halfway B |
PM CNRL Crush Halfway A Unit 1 Feb-11-20 (pdf)
| Date Issued |
February 11, 2020 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Crush |
| Reservoir Formation | Halfway A |
PM CNRL Cecil Siphon 'A' Cecil Cecil 'A' Apr-06-01 (pdf)
| Date Issued |
April 6, 2001 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Cecil Lake |
| Reservoir Formation | Siphon A Cecil A |
PM CNRL Buick Creek Lower Halfway 'I' Jul-16-99 (pdf)
| Date Issued |
July 16, 1999 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Buick Creek |
| Reservoir Formation | Lower Halfway 'I' |
PM CNRL Buick Creek Lower Halfway 'D' Oct-06-98 (pdf)
| Date Issued |
October 6, 1998 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Buick Creek |
| Reservoir Formation | Lower Halfway 'D' |
PM CNRL Buick Creek Lower Halfway 'D' Amend 1 Jun-17-99 (pdf)
| Date Issued |
June 17, 1999 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Buick Creek |
| Reservoir Formation | Lower Halfway 'D' |
PM CNRL Buick Creek Lower Halfway 'C' Mar-10-15 (pdf)
| Date Issued |
March 12, 2015 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Buick Creek |
| Reservoir Formation | Lower Halfway 'C' |
PM CNRL Buick Creek Lower Halfway 'C' Apr-07-99 (pdf)
| Date Issued |
April 7, 1999 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Buick Creek |
| Reservoir Formation | Lower Halfway 'C' |
PM CNRL Buick Creek Lower Halfway 'C' Amend Jun-22-99 (pdf)
| Date Issued |
June 22, 1999 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Buick Creek |
| Reservoir Formation | Lower Halfway 'C' |
PM CNRL Buick Creek Lower Halfway 'B' Jan-21-98 (pdf)
| Date Issued |
January 21, 1998 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Buick Creek |
| Reservoir Formation | Lower Halfway 'B' |
PM CNRL Buick Creek Lower Halfway 'B' Apr-07-99 (pdf)
| Date Issued |
April 7, 1999 |
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Ltd. (CNRL) |
| Reservoir Field | Buick Creek |
| Reservoir Formation | Lower Halfway 'B' |