Skip to main content

Approval documents available include both orders and explanatory cover letters for: waterflood (pressure maintenance), gas injection, innovative technology (experimental), Good Engineering Practice, disposal wells, observation wells, Concurrent Production, commingled production, and gascap blowdown.

These records span from 1964 to present-date and include any amendments made to an approval, as well as denial letters. Applications for these approvals may be requested by submission of a well data request form. The company name is that at the time of correspondence, and may not reflect the current well permit holder. The filter function allows partial entry of a single data field as search criteria.


14 items

Sort: Title / Date Issued

Date Issued:  

INJ GEOTERRA-ALCAN Evie Debolt WA 17986 Dec-21-09 (pdf)

Reservoir Project Type Injectivity Testing
Applicant Geoterra I.R.S.Ltd.
Reservoir Field Evie Bank
Reservoir Formation Debolt
WA Number 17986

Date Issued:  

WATERINJ TALISMAN Pintail Debolt WA 22801 Nov-12-09 (pdf)

Reservoir Project Type Injectivity Testing
Applicant Talisman Energy Inc.
Reservoir Field Pintail
Reservoir Formation Debolt
WA Number 22801

Date Issued:  

WATERINJ SWD ENCANA Etsho Debolt WA 24469 Oct-22-09 (pdf)

Reservoir Project Type Injectivity Testing
Applicant Encana
Reservoir Field Etsho
Reservoir Formation Debolt
WA Number 24469

Date Issued:  

WATERINJ ARC Doe Belloy WA 25345 Jun-17-09 (pdf)

Reservoir Project Type Injectivity Testing
Applicant ARC Resouces Ltd.
Reservoir Field Doe
Reservoir Formation Belloy
WA Number 25345

Date Issued:  

WATERINJ DEVON ARL Komie Debolt WA 24381 May-4-09 (pdf)

Reservoir Project Type Injectivity Testing
Applicant Devon Canada C
Reservoir Field Komie
Reservoir Formation Debolt
WA Number 24381

Date Issued:  

WATERINJ QUICKSILVER Fortune Debolt WA 25191 Mar-30-09 (pdf)

Reservoir Project Type Injectivity Testing
Applicant Quicksilver Resources Canada Inc.
Reservoir Field Horn River
Reservoir Formation Debolt
WA Number 25191

Date Issued:  

WATERINJ SMR Tattoo Elkton WA 25340 Mar-27-09 (pdf)

Reservoir Project Type Injectivity Testing
Applicant Stone Mountain Resources Ltd.
Reservoir Field Tattoo
Reservoir Formation Elkton
WA Number 25340

Date Issued:  

WATERINJ EOG Maxhamish Fantasque WA 13307 Mar-13-09 (pdf)

Reservoir Project Type Injectivity Testing
Applicant EOG Resources Canada
Reservoir Field Maxhamish Lake
Reservoir Formation Fantasque
WA Number 13307

Date Issued:  

WATERINJ APACHE Sikanni WA 25140 Feb-19-09 (pdf)

Reservoir Project Type Injectivity Testing
Applicant Apache Canada Ltd.
Reservoir Field Other Areas
Reservoir Formation Sikanni
WA Number 25140

Date Issued:  

WATERINJ QUICKSILVER Fortune Debolt Pekisko WA 3282 Feb-16-09 Test Approval 2 (pdf)

Reservoir Project Type Injectivity Testing
Applicant Quicksilver Resources Canada Inc.
Reservoir Field Horn River
Reservoir Formation Debolt
WA Number 03282

Date Issued:  

WATERINJ SHELL Farrell Baldonnel WA 24448 Feb-12-09 (pdf)

Reservoir Project Type Injectivity Testing
Applicant Shell
Reservoir Field Farrell Creek West
Reservoir Formation Baldonnel
WA Number 24448

Date Issued:  

WATERINJ MURPHY Swan Baldonnel WA 24405 Feb-3-09 (pdf)

Reservoir Project Type Injectivity Testing
Applicant Murphy Oil
Reservoir Field Swan Lake
Reservoir Formation Baldonnel
WA Number 24405

Date Issued:  

WATERINJ NEXEN Tsea Debolt WA 25113 Feb-2-09 Temp (pdf)

Reservoir Project Type Injectivity Testing
Applicant Nexen Inc
Reservoir Field Tsea
Reservoir Formation Debolt
WA Number 25113

Date Issued:  

WATERINJ QUICKSILVER Fortune Debolt WA 3282 Feb-2-09 TEMP (pdf)

Reservoir Project Type Injectivity Testing
Applicant Quicksilver Resources Canada Inc.
Reservoir Field Horn River
Reservoir Formation Debolt
WA Number 03282