Approval documents available include both orders and explanatory cover letters for: waterflood (pressure maintenance), gas injection, innovative technology (experimental), Good Engineering Practice, disposal wells, observation wells, Concurrent Production, commingled production, and gascap blowdown.
These records span from 1964 to present-date and include any amendments made to an approval, as well as denial letters. Applications for these approvals may be requested by submission of a well data request form. The company name is that at the time of correspondence, and may not reflect the current well permit holder. The filter function allows partial entry of a single data field as search criteria.
Date Issued:
PM VENTURION Mica Doig B Nov-28-17 (pdf)
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Venturion Oil Limited |
| Reservoir Field | Mica |
| Reservoir Formation | Doig B |
Date Issued:
PM PAVILION Red Creek Field Doig C Amend 4 Oct-27-17 (pdf)
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Pavilion Energy Corporation |
| Reservoir Field | Red Creek |
| Reservoir Formation | Doig C |
Date Issued:
PM WHITECAP Boundary Lake Boundary Lake A Amend 16 Sep-21-17 (pdf)
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Whitecap Resources Inc. |
| Reservoir Field | Boundary Lake |
| Reservoir Formation | Boundary Lake A |
Date Issued:
PM CNRL Birch Baldonnel C Amend 4 Sep-15-17 (pdf)
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Birch |
| Reservoir Formation | Baldonnel |
Date Issued:
PM WHITECAP Boundary Lake Boundary Lake A Amend 15 Jul-31-17 (pdf)
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Whitecap Resources Inc. |
| Reservoir Field | Boundary Lake |
| Reservoir Formation | Boundary Lake A |
Date Issued:
PM CNRL Eagle West Belloy A Amend 7 Jul-31-17 (pdf)
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Canadian Natural Resources Limited |
| Reservoir Field | Eagle West |
| Reservoir Formation | Belloy A |
Date Issued:
PM Pavilion Red Creek Doig C Amend 3 Jun-30-17 (pdf)
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Pavilion Energy Corporation |
| Reservoir Field | Red Creek |
| Reservoir Formation | Doig C |
Date Issued:
PM VENTURION Mica Mica A Amend 3 Apr-3-17 (pdf)
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Venturion Oil Limited |
| Reservoir Field | Mica |
| Reservoir Formation | Mica A |
Date Issued:
PM PENGROWTH Beatton River Halfway A Feb-01-17 (pdf)
| Reservoir Project Type | Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection |
| Applicant | Pengrowth Energy Corporation |
| Reservoir Field | Beatton River |
| Reservoir Formation | Halfway A |