Skip to main content

Approval documents available include both orders and explanatory cover letters for: waterflood (pressure maintenance), gas injection, innovative technology (experimental), Good Engineering Practice, disposal wells, observation wells, Concurrent Production, commingled production, and gascap blowdown.

These records span from 1964 to present-date and include any amendments made to an approval, as well as denial letters. Applications for these approvals may be requested by submission of a well data request form. The company name is that at the time of correspondence, and may not reflect the current well permit holder. The filter function allows partial entry of a single data field as search criteria.


9 items

Sort: Title / Date Issued

Date Issued:  

PM VENTURION Mica Doig B Nov-28-17 (pdf)

Reservoir Project Type Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection
Applicant Venturion Oil Limited
Reservoir Field Mica
Reservoir Formation Doig B

Date Issued:  

PM PAVILION Red Creek Field Doig C Amend 4 Oct-27-17 (pdf)

Reservoir Project Type Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection
Applicant Pavilion Energy Corporation
Reservoir Field Red Creek
Reservoir Formation Doig C

Date Issued:  

PM WHITECAP Boundary Lake Boundary Lake A Amend 16 Sep-21-17 (pdf)

Reservoir Project Type Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection
Applicant Whitecap Resources Inc.
Reservoir Field Boundary Lake
Reservoir Formation Boundary Lake A

Date Issued:  

PM CNRL Birch Baldonnel C Amend 4 Sep-15-17 (pdf)

Reservoir Project Type Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection
Applicant Canadian Natural Resources Limited
Reservoir Field Birch
Reservoir Formation Baldonnel

Date Issued:  

PM WHITECAP Boundary Lake Boundary Lake A Amend 15 Jul-31-17 (pdf)

Reservoir Project Type Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection
Applicant Whitecap Resources Inc.
Reservoir Field Boundary Lake
Reservoir Formation Boundary Lake A

Date Issued:  

PM CNRL Eagle West Belloy A Amend 7 Jul-31-17 (pdf)

Reservoir Project Type Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection
Applicant Canadian Natural Resources Limited
Reservoir Field Eagle West
Reservoir Formation Belloy A

Date Issued:  

PM Pavilion Red Creek Doig C Amend 3 Jun-30-17 (pdf)

Reservoir Project Type Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection
Applicant Pavilion Energy Corporation
Reservoir Field Red Creek
Reservoir Formation Doig C

Date Issued:  

PM VENTURION Mica Mica A Amend 3 Apr-3-17 (pdf)

Reservoir Project Type Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection
Applicant Venturion Oil Limited
Reservoir Field Mica
Reservoir Formation Mica A

Date Issued:  

PM PENGROWTH Beatton River Halfway A Feb-01-17 (pdf)

Reservoir Project Type Pressure Maintenance Waterflood or Pressure Maintenance Gas Injection
Applicant Pengrowth Energy Corporation
Reservoir Field Beatton River
Reservoir Formation Halfway A